- Task: Lowest unit of work. Smallest traceable item on project work plan and forms basis of work breakdown structure. Results in a new or revised work product.
- Work Product: Output of a task. Required to meet project objectives. Need not be a document. May or may not be a deliverable.
- Dependency: Define relationships between tasks or activities.
- Process: Usually a sub project and can span more than one phase
- Phase: Temporary grouping of tasks. Natural point for milestones and checkpoints.
- Lifecycle Milestone: Occurs at phase boundaries. Assure objectives of phase are met. Assure readiness of project to move to next phase.
- Activity: Next Level below a phase. Groups related tasks. Results in milestone or deliverable. May be from different processes. Begin and end in the same phase.
There are 4 types of dependencies:
- Predecessors
- Successors
- Overlap
- Gap
There are 5 Lifecycle Milestones defined in OUM. Their acronym are
LO, LA, IOC, SP and SO.
- LO = Lifecycle Objective
- LA = Lifecycle Architecture
- IOC = Initial Operating Capability
- SP = System Production
- SO = Sign-off